This lesson develops practical capability in Capacity Planning, Planned Orders, Production Orders, Scheduling, Availability, Release, and Shop-Floor Control within TS421 – SAP S/4HANA Production Planning & Manufacturing Academy Part I. Learners connect SAP concepts to implementation decisions, business controls, troubleshooting, and measurable results.
The instructor traces a manufacturing team establishing an integrated planning and execution model from demand through procurement proposals, order release, confirmation, and inventory updates. The walkthrough connects navigation, configuration or process logic, system messages, and evidence captured in the TS421 planning, MRP, capacity, and production-execution academy workbook. It also tests the exception where MRP generates unsuitable proposals because material master, bills of material, routings, production versions, demand, lot sizing, and planning parameters are inconsistent.
Complete a controlled SAP exercise covering Capacity Planning, Planned Orders, Production Orders, Scheduling, Availability, Release, and Shop-Floor Control and preserve the verified result in the TS421 planning, MRP, capacity, and production-execution academy workbook.
Start where expected SAP behavior first differs from the observed result. Check master data, configuration sequence, authorization, integration, status, and transaction evidence separately. Treat “MRP generates unsuitable proposals because material master, bills of material, routings, production versions, demand, lot sizing, and planning parameters are inconsistent” as a hypothesis until system settings, logs, documents, and outcomes confirm the cause.
Learners can apply Capacity Planning, Planned Orders, Production Orders, Scheduling, Availability, Release, and Shop-Floor Control, explain the resulting SAP behavior, and defend the outcome through the TS421 planning, MRP, capacity, and production-execution academy workbook.