Participants work through SUM Preparation, Target HANA, and Preprocessing to prepare the migration environment and close readiness gaps before downtime. The activity is grounded in an SAP operations program converting an existing database to SAP HANA while combining system update work, limiting downtime, and retaining a defensible cutover trail and contributes directly to controlled DMO migration.
The instructor models an end-to-end decision path covering SUM extraction and configuration, Target database connectivity, Prechecks and simplification findings, Shadow system preparation. Navigation, documents, configuration influences, authorization boundaries, and retained evidence are connected to SUM preprocessing evidence pack, including a controlled test where a preprocessing check passes while a required target database parameter remains unsuitable.
Complete a controlled activity covering SUM extraction and configuration, Target database connectivity, Prechecks and simplification findings, Shadow system preparation and preserve the final result in SUM preprocessing evidence pack.
Start at the earliest point where expected SAP behavior differs from the observed result. Review process sequence, master data, organizational assignments, configuration, authorization, integration, and timing separately. Treat “a preprocessing check passes while a required target database parameter remains unsuitable” as a testable hypothesis until settings, documents, logs, reports, and retest outcomes confirm the cause.
Learners can apply SUM Preparation, Target HANA, and Preprocessing, explain the resulting SAP behavior, and defend the outcome through SUM preprocessing evidence pack.